Power Generation
Operate renewable and hybrid power plants as one controlled system
SCADA, PPC, hybrid, storage and renewable performance for generation assets.
Products and delivery responsibilities
Assemble the operating stack around the action.
Solution selection
Choose the operational problem you need to solve.
Power Plant SCADA and Operations
Centralise renewable plant telemetry, alarms, dashboards, reports, workflows and field connectivity with EnergyPortal and Scadify.
Explore this solution →Power Plant Controller and Grid Control
Control plant active and reactive power, voltage, power factor, ramps and point-of-connection behaviour with enPowerManager.
Explore this solution →Hybrid Wind, Solar and Storage Plant Management
Coordinate wind, solar and storage resources behind a shared grid connection with local PPC control and central operations.
Explore this solution →BESS Energy Storage Control and Integration
Integrate battery storage with plant PPC, local field control, operating constraints, telemetry, reporting and grid objectives.
Explore this solution →Renewable Energy Performance Analytics
Connect production, weather, availability, alarms, curtailment and maintenance data to explain renewable plant performance.
Explore this solution →TEİAŞ Grid Compliance and PPC Engineering
Translate Turkish grid and project requirements into PPC functions, measurements, records, tests and operational documentation.
Explore this solution →Operational workflow
From operational context to measured action.
- 01Map plant, site and device responsibility
- 02Acquire and qualify measurements
- 03Correlate alarms, events and equipment state
- 04Assign workflow or approved action
- 05Report and preserve operational evidence
Data sources and integrations
Connect the evidence that explains the decision.
- Plant meters and analyzers
- Inverters, turbine and storage controllers
- Weather and irradiance stations
- Point-of-connection measurements
- Plant SCADA and dispatch context
Governance and resilience
Grid-code and TEİAŞ requirements depend on the connection agreement, applicable technical criteria and tested project configuration. Software does not create compliance automatically.
Protocol roles, OEM compatibility, data retention, control limits and failure behaviour must be confirmed from the engineering-approved release and project documents.