Power Consumption
Make lighting and electrical loads respond to real operating conditions
Manage schedules, occupancy, zones, load priorities, overrides and runtime evidence for lighting and electrical loads.
Operational problem
Utility totals rarely explain the operational reason for consumption. Weather, production, shifts, occupancy, comfort, safety and equipment constraints must be connected before a recommendation can become a safe action.
enCoreEnergy combines measurements with operational context, analytics, AI-supported recommendations, workflows and verification. Scadify or existing BMS/PLC systems provide qualified local acquisition and execution; EnergyPortal can consolidate enterprise portfolios.
Core capabilities
Zone and branch hierarchy
Configured according to the project’s data, control, approval and operating boundaries.
Schedule, occupancy and daylight context
Configured according to the project’s data, control, approval and operating boundaries.
Load priorities and remote overrides
Configured according to the project’s data, control, approval and operating boundaries.
Out-of-hours exception detection
Configured according to the project’s data, control, approval and operating boundaries.
Local fallback and runtime analysis
Configured according to the project’s data, control, approval and operating boundaries.
Products and delivery responsibilities
Assemble the operating stack around the action.
Operational workflow
From operational context to measured action.
- 01Map zones, circuits and operating hours
- 02Collect state and occupancy context
- 03Apply policy or identify exception
- 04Approve override or execute control
- 05Review runtime and demand evidence
Data sources and integrations
Connect the evidence that explains the decision.
- Utility meters and submeters
- HVAC, lighting, pumps and equipment state
- Production, shifts, schedules and occupancy
- Weather, temperature and humidity
- Tariffs, invoices and maintenance context
Governance and resilience
Direct control is constrained by installed systems, safety interlocks, operating policy and customer approval. Recommendations, workflows and closed-loop control are separate modes.
Protocol roles, OEM compatibility, data retention, control limits and failure behaviour must be confirmed from the engineering-approved release and project documents.
Outcomes and KPI framework
Measure the operating result, not only the software activity.
Normalised energy-performance indicators
Use an agreed baseline, operational definition and evidence source before assigning a target.
Prioritised demand, schedule and equipment opportunities
Use an agreed baseline, operational definition and evidence source before assigning a target.
Human-approved actions with clear ownership
Use an agreed baseline, operational definition and evidence source before assigning a target.
Baseline and reporting-period evidence
Use an agreed baseline, operational definition and evidence source before assigning a target.
Solution architecture
Make responsibility visible from field to enterprise.
enCoreEnergy combines measurements with operational context, analytics, AI-supported recommendations, workflows and verification. Scadify or existing BMS/PLC systems provide qualified local acquisition and execution; EnergyPortal can consolidate enterprise portfolios. The architecture separates observation, recommendation, human-approved action and local execution so that each team can see what it owns.
Engineering and implementation
Move from architecture to accepted operation.
Engineering scope can include meter inventory, baseline design, significant-use analysis, interlock review, pilot acceptance criteria, field integration, commissioning, operator training and M&V planning.
Publication boundary
Capabilities are described as supported or project-configured where appropriate. Customer identities, quantified results, certifications and regulatory acceptance are not inferred from the solution page.
Related solutions and products
Continue with the next operational question.
FAQ
Questions to resolve before implementation.
Can local overrides be tracked?
Where the installed control system exposes the required signals, overrides and actions can be recorded in the operational history.
Can lighting be part of peak management?
Lighting loads can be considered where their priority, control boundary and operational constraints are defined.
Does this replace the lighting controller?
No. The solution integrates with or coordinates approved local controls; replacement scope is project-specific.
Next step