Field Automation
Modernise field systems without creating an uncontrolled cutover
Modernise brownfield SCADA, PLC, RTU and telemetry systems through staged integration, coexistence, migration and validated cutover.
Operational problem
Remote sites must continue acquiring, alarming and executing approved local logic through protocol diversity, brownfield equipment and intermittent central connectivity.
Scadify separates canonical tags, protocol drivers, local HMI, historian, alarms and automation runtime from physical hardware. EnergyPortal, enPowerManager and enCoreEnergy consume governed field evidence and provide higher-level context.
Core capabilities
Brownfield discovery and inventory
Configured according to the project’s data, control, approval and operating boundaries.
Coexistence and parallel-run architecture
Configured according to the project’s data, control, approval and operating boundaries.
Canonical model and protocol conversion
Configured according to the project’s data, control, approval and operating boundaries.
Data and control validation
Configured according to the project’s data, control, approval and operating boundaries.
Staged migration, rollback and handover
Configured according to the project’s data, control, approval and operating boundaries.
Products and delivery responsibilities
Assemble the operating stack around the action.
Field acquisition, local automation, protocols and resilient execution.
View responsibility →EnergyPortalCentral visibility, analytics, reporting, workflows and governance.
View responsibility →Engineering & ServicesAssessment, integration, installation, testing and commissioning.
View responsibility →Operational workflow
From operational context to measured action.
- 01Document legacy devices and responsibilities
- 02Define coexistence boundaries
- 03Map and validate data
- 04Run parallel tests
- 05Cut over with rollback and acceptance evidence
Data sources and integrations
Connect the evidence that explains the decision.
- Meters, sensors, analyzers and actuators
- PLCs, RTUs, BMS and existing SCADA
- Modbus, MQTT and project-qualified telecontrol interfaces
- Local alarms, commands, deployments and audit logs
- Central configuration and operational policies
Governance and resilience
Scadify is intended for non-safety and project-qualified automation unless a separately validated safety architecture exists. Protocol maturity, hardware and certification status follow the release matrix.
Protocol roles, OEM compatibility, data retention, control limits and failure behaviour must be confirmed from the engineering-approved release and project documents.
Outcomes and KPI framework
Measure the operating result, not only the software activity.
Local-first operation and evidence
Use an agreed baseline, operational definition and evidence source before assigning a target.
Reusable device/tag model across field platforms
Use an agreed baseline, operational definition and evidence source before assigning a target.
Controlled protocol and command boundaries
Use an agreed baseline, operational definition and evidence source before assigning a target.
Staged integration and rollback visibility
Use an agreed baseline, operational definition and evidence source before assigning a target.
Solution architecture
Make responsibility visible from field to enterprise.
Scadify separates canonical tags, protocol drivers, local HMI, historian, alarms and automation runtime from physical hardware. EnergyPortal, enPowerManager and enCoreEnergy consume governed field evidence and provide higher-level context. The architecture separates observation, recommendation, human-approved action and local execution so that each team can see what it owns.
Engineering and implementation
Move from architecture to accepted operation.
Engineering scope can include I/O and protocol assessment, panel and network design, control logic, HMI, commissioning, migration, FAT/SAT, training and lifecycle support.
Publication boundary
Capabilities are described as supported or project-configured where appropriate. Customer identities, quantified results, certifications and regulatory acceptance are not inferred from the solution page.
Related solutions and products
Continue with the next operational question.
FAQ
Questions to resolve before implementation.
Must every legacy controller be replaced?
No. Existing equipment can be retained where its interfaces, health and responsibility are suitable for the target architecture.
Can migration avoid downtime?
A staged or parallel strategy may reduce disruption, but final outage and cutover requirements are project-specific.
Can historical data be retained?
Historical data can be migrated or connected when its format, ownership, quality and retention requirements are understood.
Next step