Field Automation

Modernise field systems without creating an uncontrolled cutover

Modernise brownfield SCADA, PLC, RTU and telemetry systems through staged integration, coexistence, migration and validated cutover.

Legacy SCADA modernization using coexistence, canonical mapping and controlled migration
Conceptual solution architecture; final scope is confirmed through engineering and project acceptance.

Operational problem

Remote sites must continue acquiring, alarming and executing approved local logic through protocol diversity, brownfield equipment and intermittent central connectivity.

Scadify separates canonical tags, protocol drivers, local HMI, historian, alarms and automation runtime from physical hardware. EnergyPortal, enPowerManager and enCoreEnergy consume governed field evidence and provide higher-level context.

Core capabilities

Brownfield discovery and inventory

Configured according to the project’s data, control, approval and operating boundaries.

Coexistence and parallel-run architecture

Configured according to the project’s data, control, approval and operating boundaries.

Canonical model and protocol conversion

Configured according to the project’s data, control, approval and operating boundaries.

Data and control validation

Configured according to the project’s data, control, approval and operating boundaries.

Staged migration, rollback and handover

Configured according to the project’s data, control, approval and operating boundaries.

Operational workflow

From operational context to measured action.

  1. 01Document legacy devices and responsibilities
  2. 02Define coexistence boundaries
  3. 03Map and validate data
  4. 04Run parallel tests
  5. 05Cut over with rollback and acceptance evidence

Data sources and integrations

Connect the evidence that explains the decision.

  • Meters, sensors, analyzers and actuators
  • PLCs, RTUs, BMS and existing SCADA
  • Modbus, MQTT and project-qualified telecontrol interfaces
  • Local alarms, commands, deployments and audit logs
  • Central configuration and operational policies

Governance and resilience

Scadify is intended for non-safety and project-qualified automation unless a separately validated safety architecture exists. Protocol maturity, hardware and certification status follow the release matrix.

Protocol roles, OEM compatibility, data retention, control limits and failure behaviour must be confirmed from the engineering-approved release and project documents.

Outcomes and KPI framework

Measure the operating result, not only the software activity.

Local-first operation and evidence

Use an agreed baseline, operational definition and evidence source before assigning a target.

Reusable device/tag model across field platforms

Use an agreed baseline, operational definition and evidence source before assigning a target.

Controlled protocol and command boundaries

Use an agreed baseline, operational definition and evidence source before assigning a target.

Staged integration and rollback visibility

Use an agreed baseline, operational definition and evidence source before assigning a target.

Solution architecture

Make responsibility visible from field to enterprise.

Scadify separates canonical tags, protocol drivers, local HMI, historian, alarms and automation runtime from physical hardware. EnergyPortal, enPowerManager and enCoreEnergy consume governed field evidence and provide higher-level context. The architecture separates observation, recommendation, human-approved action and local execution so that each team can see what it owns.

Legacy SCADA modernization using coexistence, canonical mapping and controlled migration
Legacy SCADA modernization using coexistence, canonical mapping and controlled migration. Important control and compliance decisions remain in the project documentation.

Engineering and implementation

Move from architecture to accepted operation.

Engineering scope can include I/O and protocol assessment, panel and network design, control logic, HMI, commissioning, migration, FAT/SAT, training and lifecycle support.

Publication boundary

Capabilities are described as supported or project-configured where appropriate. Customer identities, quantified results, certifications and regulatory acceptance are not inferred from the solution page.

FAQ

Questions to resolve before implementation.

Must every legacy controller be replaced?

No. Existing equipment can be retained where its interfaces, health and responsibility are suitable for the target architecture.

Can migration avoid downtime?

A staged or parallel strategy may reduce disruption, but final outage and cutover requirements are project-specific.

Can historical data be retained?

Historical data can be migrated or connected when its format, ownership, quality and retention requirements are understood.

Next step

Define the right field automation architecture.

Discuss your project →